|
|
| 编号 | 文件名称 | 上传用户 | 文件大小 | 类型 | 上传日期 | 下载/浏览 | 价格(元) |
| 80887 | ★105+70m斜独塔单索面斜拉桥(1/4) | choshu | 10,000KB | .rar | 2011/10/9 | 5/4944 | ¥40.00 |
| 80886 | 信号交叉口直行待行区的设置研究 | signalxml | 229KB | .pdf | 2011/10/9 | 0/1885 | ¥4.00 |
| 80884 | 东华大桥方案说明书(118m异形钢管拱) | choshu | 6,509KB | .pdf | 2011/10/9 | 4/2064 | ¥16.00 |
| 80877 | 十大不可思议的桥梁.ppt | dragonhealthy | 3,607KB | .ppt | 2011/10/9 | 2/1183 | ¥2.00 |
| 80876 | 3.4x8.5x33m空心墩强度校核计算书 | dragonhealthy | 467KB | .doc | 2011/10/9 | 1/1299 | ¥6.00 |
| 80875 | Computational_Plasticity | bridgeche | 4,056KB | .rar | 2011/10/9 | 3/924 | ¥2.00 |
| 80874 | 69+113+69m矮塔斜拉桥监控报告 | choshu | 584KB | .pdf | 2011/10/9 | 4/2192 | ¥10.00 |
| 80873 | ANSYS civilfem-pushover | bridgeche | 450KB | .rar | 2011/10/9 | 1/1695 | ¥2.00 |
| 80870 | 基坑开挖施工对临近地铁影响的实测分析 | liutianjun79 | 562KB | .pdf | 2011/10/9 | 0/2223 | ¥4.00 |
| 80869 | 灌沙法现场记录反算xls | yangye198809 | 54KB | .xls | 2011/10/8 | 1/1933 | ¥2.00 |
| 80867 | 某市公交站台施工图1张 | cino | 80KB | .dwg | 2011/10/8 | 118/3127 | ¥0.00 |
| 80866 | 管桩自动编号.vlx | dupingyang | 2KB | .rar | 2011/10/8 | 0/5066 | ¥2.00 |
| 80864 | 大跨度悬索桥空间几何非线性分析(博士) | choshu | 11,610KB | .nh | 2011/10/8 | 0/2746 | ¥10.00 |
| 80863 | 葫芦口大桥初步设计总说明 | choshu | 5,211KB | .pdf | 2011/10/8 | 2/2140 | ¥20.00 |
| 80862 | ★2x140m独塔斜拉桥施工图咨询审查报告 | choshu | 4,463KB | .pdf | 2011/10/8 | 8/3404 | ¥20.00 |
| 80861 | 25m后张简支空心板通用图(旧0~45°) | choshu | 2,637KB | .rar | 2011/10/8 | 1/3138 | ¥10.00 |
| 80860 | 25m后张连续空心板通用图(旧0~45°) | choshu | 3,531KB | .rar | 2011/10/8 | 1/2391 | ¥10.00 |
| 80859 | ★钢桥及钢结构熔焊的一些基本理论 | vten1 | 6,465KB | .ppt | 2011/10/8 | 8/1921 | ¥6.00 |
|