|
|
| 编号 | 文件名称 | 上传用户 | 文件大小 | 类型 | 上传日期 | 下载/浏览 | 价格(元) |
| 154833 | 彭水新城五湖片区道路施工图2/2 | winmsp | 24,412KB | .rar | 2020/11/20 | 3/731 | ¥15.00 |
| 154832 | 彭水新城五湖片区道路施工图1/2 | winmsp | 47,185KB | .rar | 2020/11/20 | 3/896 | ¥15.00 |
| 154831 | 重庆高新区虎峰大道西延段图纸3/3 | winmsp | 4,076KB | .rar | 2020/11/20 | 4/598 | ¥14.00 |
| 154830 | 重庆高新区虎峰大道西延段图纸2/3 | winmsp | 47,185KB | .rar | 2020/11/20 | 4/639 | ¥15.00 |
| 154829 | 重庆高新区虎峰大道西延段图纸1/3 | winmsp | 47,185KB | .rar | 2020/11/20 | 4/830 | ¥15.00 |
| 154824 | 铁建重工培训-盾构机液压原理 | xiaoludan | 26,279KB | .ppt | 2020/11/20 | 0/764 | ¥3.00 |
| 154823 | 溧阳至宁德高速03段测量总体工作规划 | 非必填 | 3,951KB | .doc | 2020/11/20 | 2/744 | ¥5.00 |
| 154822 | 盾构典型事故安全分析与防止措施 | xiaoludan | 50,845KB | .zip | 2020/11/19 | 0/949 | ¥3.00 |
| 154821 | 盾构机械构成及工作原理培训2016 | xiaoludan | 47,633KB | .ppt | 2020/11/19 | 0/729 | ¥5.00 |
| 154820 | 盾构法技术发展与展望(2/2) | xiaoludan | 47,042KB | .ppt | 2020/11/19 | 0/851 | ¥2.00 |
| 154819 | 盾构法技术发展与展望(1/2) | xiaoludan | 43,856KB | .ppt | 2020/11/19 | 0/912 | ¥2.00 |
| 154817 | 隧道超欠挖控制新技术ppt | xiaoludan | 38,917KB | .zip | 2020/11/19 | 0/846 | ¥5.00 |
| 154816 | 水下隧道设计与施工技术探讨2/2 | xiaoludan | 21,757KB | .zip | 2020/11/19 | 0/658 | ¥3.00 |
| 154815 | 水下隧道设计与施工技术探讨1/2 | xiaoludan | 37,748KB | .z01 | 2020/11/19 | 0/756 | ¥3.00 |
| 154814 | 蒙西华中铁路质量自控体系 | xiaoludan | 871KB | .zip | 2020/11/19 | 0/3530 | ¥5.00 |
| 154813 | 贵广铁路贵阳北站房工程创优策划 | xiaoludan | 4,043KB | .doc | 2020/11/19 | 0/3524 | ¥3.00 |
| 154810 | 高速铁路路基工程地基处理技术 | xiaoludan | 41,290KB | pptx | 2020/11/19 | 1/696 | ¥5.00 |
| 154809 | 现代隧道力学与信息化技术 | xiaoludan | 17,813KB | .pdf | 2020/11/19 | 0/549 | ¥3.00 |
|