|
|
| 编号 | 文件名称 | 上传用户 | 文件大小 | 类型 | 上传日期 | 下载/浏览 | 价格(元) |
| 80215 | 京杭运河73+130+73m连续箱梁结构验算 | sd3188000 | 1,663KB | .zip | 2011/9/19 | 2/2600 | ¥8.00 |
| 80214 | 140m无背索独塔斜拉桥结构验算 | sd3188000 | 582KB | .doc | 2011/9/19 | 4/2500 | ¥6.00 |
| 80213 | 玉屏舞阳河150m砼箱型拱桥咨询报告 | sd3188000 | 340KB | .doc | 2011/9/19 | 7/2197 | ¥6.00 |
| 80211 | 装配式斜交空心板桥受力与设计方法研究 | hsf001002003 | 2,092KB | .pdf | 2011/9/19 | 1/2351 | ¥10.00 |
| 80210 | 滦河大桥5×60m钢筋砼箱型拱桥 | lzcwq2002 | 13,301KB | .rar | 2011/9/19 | 7/3108 | ¥30.00 |
| 80209 | SOLIDWORKS 2008三维建模实例精解(5/5) | choshu | 4,306KB | .rar | 2011/9/18 | 0/1546 | ¥2.00 |
| 80208 | SOLIDWORKS 2008三维建模实例精解(4/5) | choshu | 4,457KB | .rar | 2011/9/18 | 0/1531 | ¥4.00 |
| 80207 | SOLIDWORKS 2008三维建模实例精解(3/5) | choshu | 4,457KB | .rar | 2011/9/18 | 0/1508 | ¥4.00 |
| 80206 | SOLIDWORKS 2008三维建模实例精解(2/5) | choshu | 4,457KB | .rar | 2011/9/18 | 0/1345 | ¥4.00 |
| 80205 | SOLIDWORKS 2008三维建模实例精解(1/5) | choshu | 4,457KB | .rar | 2011/9/18 | 0/1570 | ¥4.00 |
| 80204 | 好力堡至通辽高速初设汇报材料(3/6) | lihc | 19,922KB | .rar | 2011/9/18 | 5/1813 | ¥2.00 |
| 80203 | 好力堡至通辽高速初设汇报材料(6/6) | lihc | 2,391KB | .rar | 2011/9/18 | 5/2064 | ¥2.00 |
| 80202 | 好力堡至通辽高速初设汇报材料(5/6) | lihc | 19,922KB | .rar | 2011/9/18 | 5/2003 | ¥2.00 |
| 80201 | 好力堡至通辽高速初设汇报材料(4/6) | lihc | 19,922KB | .rar | 2011/9/18 | 5/1939 | ¥2.00 |
| 80200 | 好力堡至通辽高速初设汇报材料(2/6) | lihc | 19,922KB | .rar | 2011/9/18 | 6/2305 | ¥2.00 |
| 80198 | 好力堡至通辽高速初设汇报材料(1/6) | lihc | 19,922KB | .rar | 2011/9/18 | 5/2401 | ¥4.00 |
| 80197 | 桥梁工程-2001第一版上册 | hewenlong2008 | 15,412KB | .pdf | 2011/9/18 | 1/1261 | ¥4.00 |
| 80196 | 1-20m空心板中桥(装饰系杆拱) | lihc | 1,603KB | .rar | 2011/9/18 | 4/3606 | ¥8.00 |
|