|
|
| 编号 | 文件名称 | 上传用户 | 文件大小 | 类型 | 上传日期 | 下载/浏览 | 价格(元) |
| 63420 | 架桥机架桥施工图片(1/2) | JtyQsC | 19,000KB | .rar | 2010/5/28 | 3/2806 | ¥4.00 |
| 63419 | 观音岩长江大桥-436m结合梁斜拉桥方案 | JtyQsC | 3,091KB | .rar | 2010/5/28 | 3/2613 | ¥20.00 |
| 63418 | 桃夭门大桥--主跨580m斜拉桥(2/2) | JtyQsC | 4,790KB | .rar | 2010/5/28 | 5/2148 | ¥40.00 |
| 63417 | 桃夭门大桥--主跨580m斜拉桥(1/2) | JtyQsC | 10,000KB | .rar | 2010/5/28 | 6/3134 | ¥40.00 |
| 63416 | 军山长江大桥252+460+252m斜拉(5/5) | JtyQsC | 1,779KB | .rar | 2010/5/28 | 4/1945 | ¥20.00 |
| 63415 | 军山长江大桥252+460+252m斜拉(4/5) | JtyQsC | 18,000KB | .rar | 2010/5/28 | 4/1912 | ¥20.00 |
| 63414 | 军山长江大桥252+460+252m斜拉(3/5) | JtyQsC | 18,000KB | .rar | 2010/5/28 | 5/2018 | ¥20.00 |
| 63413 | 军山长江大桥252+460+252m斜拉(2/5) | JtyQsC | 18,000KB | .rar | 2010/5/28 | 5/2057 | ¥20.00 |
| 63412 | 军山长江大桥252+460+252m斜拉(1/5) | JtyQsC | 18,000KB | .rar | 2010/5/28 | 6/2850 | ¥20.00 |
| 63405 | 抽水试验原理与参数测定1985版 | zhangzihao | 2,162KB | .rar | 2010/5/28 | 0/1774 | ¥3.00 |
| 63404 | 钢筋砼构件的配筋手算方法总结 | zhangzihao | 121KB | .rar | 2010/5/28 | 0/1956 | ¥1.00 |
| 63402 | 盐田路基处理图1张 | a-hu | 143KB | .dwg | 2010/5/28 | 0/1457 | ¥2.00 |
| 63398 | 内昆铁路花土坡特大桥设计 | zhangzihao | 208KB | .rar | 2010/5/28 | 0/2003 | ¥1.00 |
| 63397 | 清江七号特大桥挂篮设计与施工 | zhangzihao | 281KB | .rar | 2010/5/28 | 1/2083 | ¥4.00 |
| 63390 | 中国矿业大学材料力学课件 | wucai1220 | 11,429KB | .zip | 2010/5/28 | 1/1752 | ¥10.00 |
| 63386 | 广东南澳大桥深水区引桥下部施工图 | cjtielu | 17,825KB | .rar | 2010/5/28 | 7/2112 | ¥16.00 |
| 63382 | 抗滑桩滑坡推力分布形式的计算确定 | situbowei | 207KB | .pdf | 2010/5/28 | 0/2759 | ¥1.00 |
| 63376 | 05SG811 条形基础 | chhdong | 2,845KB | .pdf | 2010/5/28 | 0/1515 | ¥2.00 |
|